Description
Drying and Curing Instructions:
– Let dry for 1-4 hours at room temperature
– Recommended to be cured at 200°F for 2 hours
– Then at 500°F for 2 hours before use
Maximum Operating Temperature: 1600 °C
Typical testing ramp rate is more dependent on the cell rather than the seal, we recommend a heating rate of 1-2°C/minute. The paste can be cured in-situ with the test assembly that it is being used for sealing.
Technical Details
- Application Type: SOFC, SOEC
